No Injuries Reported During Structure Fire in Galesburg

Share

The Galesburg Fire Department responded to a structure fire at 201 Blaine Avenue, June 4, 2023, at 5:20 AM. The response included all three stations and the 11 personnel on duty. Upon arrival, personnel encountered smoke coming from the attic of the residence.  Battalion Chief Dave Farrell established command and the Brooks Street Station crew made entry with an attack line to extinguish the fire. The Central Station crew arrived on scene and conducted a search, and the Fremont Street Station crew secured gas and power to the residence.  

Four occupants self-evacuated prior to the Fire Department’s arrival. The fire was confined to the attic of the residence, which sustained heavy fire damage. The interior of the home sustained minor smoke and water damage throughout.  No injuries were reported.  Preliminary damage estimates are at $14,000.

An emergency callback of off-duty fire personnel was initiated to provide emergency coverage for the City. Galesburg Fire Investigators determined the fire to be unintentional.  The investigation is closed.

***Courtesy of the City of Galesburg***

Spread the word

Trending Now

Featured News Podcasts

Choose a Category

Continue Reading

U.S. 67, Illinois 135 work begins July 7

 The Illinois Department of Transportation announced that construction on U.S. 67 from 40th Avenue, about 5 miles south of Viola, to Illinois 135 and on Illinois 135 from Main Street

Forecast for July 8-14

USDA meteorologist Brad Rippey says above normal temperatures and near to above normal precipitation are in the weather forecast for the period of July 8 – 14.