Sidewalks Being Formed in Northeast Quadrants in Downtown Monmouth

Photo Courtesy of Prairie Communications' Kelsey Crain

Share

Here are the planned construction areas for this week (Sept 3rd -6th)

  • Underground work is on pause until the Prime Beef Festival parade takes place.
  • Please avoid using the NE quadrant as major construction is taking place. 
  • Business foot traffic is open in the NE quadrant, please stay within the marked access areas along the front of the businesses. 
  • NE Quadrant Businesses- Porter Brothers will continue forming sidewalks this week. Ramps are currently poured from Kellogg Printing to the East. If there is caution tape and barricades, please do not step on the concrete as it is curing. If the barricades and tape are removed, you are more than welcome to use the sidewalk.  If you need other arrangements, please let me know and I can see what Porter Brothers can come up with. 
  • The water bill drop box is temporarily closed during construction. Bills can be dropped off at City Hall or the Public Safety Building. 
  • Thank you for your patience and understanding as work continues. 

***Courtesy of Jason Petentler| Resident Technician-Peoria, Hutchison Engineering***

Spread the word

Trending Now

Featured News Podcasts

Choose a Category

Continue Reading

Keeping the Faith Through an NPH Diagnosis

The “Piano Man” is playing into the next piece of his life, this time announcing a neurological condition known as Normal Pressure Hydrocephalus (NPH). Billy Joel, the six-time Grammy Award winner, announced

U.S. 67, Illinois 135 work begins July 7

 The Illinois Department of Transportation announced that construction on U.S. 67 from 40th Avenue, about 5 miles south of Viola, to Illinois 135 and on Illinois 135 from Main Street